Inspections of mechanical systems shall include the following as applicable to the system:
1.Visual certification that required components of such systems are complete in accordance with the manufacturers’ installation guidelines and the approved construction documents;
2.Supports, hangers, and vibration isolation equipment areproperly spaced and anchored to supporting structure;
2.1.Seismic bracing shall be inspected in accordance with Section 1707.7.
3.Installation of required signage and safety instructions;
4.Electrical components are installed and electrical sign-off issued;
5.Ventilation balancing report is complete and in accordance with design documents and the system is operating as designed;
6.Required labeling, operational instructions and safety signage properly posted;
7.All related special inspections for such systems are complete;
8.The installation of exterior mechanical equipment for compliance with the approved construction documents, including, as applicable:
8.1.Equipment specified;
8.2.Equipment location;
8.3.Installation and attachment details;
8.4.Vibration isolation installation; and
8.5.Other items specified by the applicant of record for the mechanical equipment design necessary to verify  compliance with Section 928.2.1 of the New York City Mechanical Code.